Restaurant waste/Household waste
Xiamen Restaurant Waste Treatment Project
Project Overview:
Raw Material and Scale: restaurant waste 500 t/d (Phase I + Phase II)
Biogas Production: 34,000 m3/d
Use of Biogas: Power Generation
Start-up Time: 2018
Xiamen restaurant waste treatment project consists of two phases. Phase I has a treatment capacity of 150 t/d and uses the mesophilic anaerobic process, equipped with a 5,400 m3 anaerobic tank. The biogas produced is used for power generation. Purac provided design consultation and supply of the anaerobic system, and the project started operation in 2014. In 2017, began to build Phase II of the project, with a treatment capacity of 350 t/d, equipped with an 11,000 m3 anaerobic tank, and mesophilic anaerobic fermentation. It started operation in 2018, with a total biogas production of 34,000 m3/d from two phases. This project is the first restaurant waste treatment project in Xiamen.